LRFD Procedure for Driven Piles with Pre-Drilling on Rock

Project: Research

Project Details

Description

The objective of this project is to identify and document the relationship between the load capacity of piles installed with pilot holes into rock and their design parameters and develop a reliable Load and Resistance Factor Design (LRFD) procedure.
StatusFinished
Effective start/end date09/16/1909/16/21

Funding

  • Georgia Department of Transportation: $149,958.00