@inproceedings{ffc18eedb354422ca45cbb8a0c3eca00,
title = "Developing a knowledge based information system (KISCCES) for construction cost estimating and scheduling",
abstract = "This paper discusses a research project to develop a {"}knowledge-based information system for construction cost estimating and scheduling{"} (KISCCES). To accomplish the goal, researchers developed a prototype project management system that can produce pictorial data for all involved parties, and cost and schedule in a nearly real-time basis. The scope of the research project includes transferring pictorial data via the wireless network, measuring construction productivity using time-lapse video, and developing a graphic user interface for cost estimating and scheduling. The tasks for this project are outlined as follows: conduct literature review, purchase necessary software and hardware, define measurement data for each activity, conduct field experiments in construction projects to transmit time-lapse video wirelessly and consistently, and develop a prototype graphic user interface to estimate cost and duration on a nearly real-time basis. Upon development of the KISCCES, the researchers evaluated the estimated cost and schedule by statistically comparing it with estimates by construction industry experts.",
keywords = "Construction, Cost, Estimating, Productivity Measurement, Real-time, Schedule",
author = "Seonghoon Kim and Marcel Maghiar and Lixin Li and Yong Bai and Jason Scott",
year = "2014",
doi = "10.1061/9780784413517.0091",
language = "English",
isbn = "9780784413517",
series = "Construction Research Congress 2014: Construction in a Global Network - Proceedings of the 2014 Construction Research Congress",
publisher = "American Society of Civil Engineers (ASCE)",
pages = "887--896",
booktitle = "Construction Research Congress 2014",
address = "United States",
note = "2014 Construction Research Congress: Construction in a Global Network, CRC 2014 ; Conference date: 19-05-2014 Through 21-05-2014",
}