Integrating Sample Iterative Communication Model into Project Management Life Cycle Phases

Stephanie Onyemowo Omakwu, Lei Chen

Research output: Contribution to book or proceedingConference articlepeer-review

Abstract

Quite a few projects are faced with the challenges of not achieving stakeholders' goals or the entire project failing due to reasons such as unclear or changing goals, issues with communication, inadequate risk management, insufficient follow-up, using wrong or too many tools and challenges of context and timing. One of the major causes of all these reasons include inappropriate communication, delay in communication, using the wrong method and tool or no communication at all which is why this study is proposing an integration of the Sample Iterative Communication Model(SICM) in all the phases of project management (project initiation, planning, execution, monitoring and controlling and the completion/closing phase) to tackle the communication challenges faced during the project life cycle.

Original languageEnglish
Title of host publicationProceedings - 2023 Congress in Computer Science, Computer Engineering, and Applied Computing, CSCE 2023
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages2678-2682
Number of pages5
ISBN (Electronic)9798350327595
DOIs
StatePublished - 2023
Event2023 Congress in Computer Science, Computer Engineering, and Applied Computing, CSCE 2023 - Las Vegas, United States
Duration: Jul 24 2023Jul 27 2023

Publication series

NameProceedings - 2023 Congress in Computer Science, Computer Engineering, and Applied Computing, CSCE 2023

Conference

Conference2023 Congress in Computer Science, Computer Engineering, and Applied Computing, CSCE 2023
Country/TerritoryUnited States
CityLas Vegas
Period07/24/2307/27/23

Scopus Subject Areas

  • Statistics, Probability and Uncertainty
  • Control and Optimization
  • Modeling and Simulation
  • Artificial Intelligence
  • Computer Science Applications
  • Hardware and Architecture

Keywords

  • Communication
  • Project life cycle
  • SICM
  • Stakeholders Short Research Paper

Fingerprint

Dive into the research topics of 'Integrating Sample Iterative Communication Model into Project Management Life Cycle Phases'. Together they form a unique fingerprint.

Cite this