Simultaneous vs. Sequential Scheduling of Multiple Resources which Constrain System Throughout

J. V. Simons, M. D. Stephens, W. P. Simpson

Research output: Contribution to journalArticlepeer-review

7 Scopus citations

Abstract

The GOAL SYSTEMTM implements a drum-buffer-rope (DBR) approach to production scheduling. Earlier versions of the software were only capable of building a schedule for one constrained resource at a time. If multiple resources constrained the overall system's capability, the schedules for these resources had to be created sequentially. However, the current version contains an ability to simultaneously create multiple constraint schedules. A set of solutions was generated for benchmark problems developed in previous research. The new results were compared to solutions produced by the sequential algorithm, as well as solutions which optimally minimize maximum tardiness. The simultaneous algorithm was found to slightly reduce maximum tardiness, but performed worse with respect to average flow-time, percentage of tardy jobs and total days late.

Original languageAmerican English
JournalInternational Journal of Production Research
Volume37
DOIs
StatePublished - Jan 1 1999

Keywords

  • Constraint system
  • DBR
  • Drum-buffer-rope
  • Goal system
  • Production scheduling
  • Sequential scheduling
  • Simultaneous scheduling

DC Disciplines

  • Operations and Supply Chain Management
  • Business Administration, Management, and Operations

Fingerprint

Dive into the research topics of 'Simultaneous vs. Sequential Scheduling of Multiple Resources which Constrain System Throughout'. Together they form a unique fingerprint.

Cite this